17 Jul 2019 / Singapore
The working period has been extended for works at Tuas Western Coast has been revised. The works will now be carried out from 20 July 2019 to 19 January 2020.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.064 of 2019 dated 16 July 2019, operations will be conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following coordinates (WGS 84 Datum):
Working Area A
1) 1 deg. 20.287'N / 103 deg. 38.026'E
2) 1 deg. 20.303'N / 103 deg. 37.959'E
3) 1 deg. 20.277'N / 103 deg. 37.861'E
4) 1 deg. 19.217'N / 103 deg. 37.223'E
5) 1 deg. 18.525'N / 103 deg. 36.917'E
6) 1 deg. 17.503'N / 103 deg. 36.624'E
7) 1 deg. 16.917'N / 103 deg. 36.467'E
8) 1 deg. 16.908'N / 103 deg. 36.563'E
9) 1 deg. 17.061'N / 103 deg. 36.722'E
10) 1 deg. 17.110'N / 103 deg. 36.770'E
11) 1 deg. 17.440'N / 103 deg. 36.857'E
12) 1 deg. 18.434'N / 103 deg. 37.121'E
13) 1 deg. 18.487'N / 103 deg. 37.198'E
14) 1 deg. 18.478'N / 103 deg. 37.226'E
15) 1 deg. 18.157'N / 103 deg. 37.108'E
Working Area B
16) 1 deg. 18.111'N / 103 deg. 37.230'E
17) 1 deg. 19.857'N / 103 deg. 37.355'E
18) 1 deg. 19.817'N / 103 deg. 37.418'E
19) 1 deg. 19.065'N / 103 deg. 36.969'E
20) 1 deg. 19.284'N / 103 deg. 36.995'E
The work involves dredging and dumping operations and also includes: installation, shifting and maintenance of navigational buoys; shifting, installation and maintenance of temporary jetty within the working area; construction and maintenance of silt barricade within working area; removal of rocks at existing revetments and construction of rock revetments; re-handling works within working area; sand re-handling works from APTE1 to TWC reclamation area; receiving of external sand; survey (Pre/Post survey, Interim, Progress (Monthly) and 3 monthly surveys); transportation and dumping of dredged material from TWC to TTP2.
A safety boat will be deployed in the vicinity of the working area to warn other craft and vessels of the work.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.