30 Jul 2019 / Singapore
The working period for works at Tuas Terminal Phase 1 has been extended, and the working area revised.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.071 of 2019, the works will be carried out 24 hours daily - including Sundays & Public Holidays - from 1 August 2019 to 1 February 2020, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 15.650’N / 103 deg. 37.040’E
2) 01 deg. 14.290’N / 103 deg. 37.039’E
3) 01 deg. 14.289’N / 103 deg. 36.979’E
4) 01 deg. 14.200’N / 103 deg. 37.005’E
5) 01 deg. 14.207’N / 103 deg. 37.237’E
6) 01 deg. 14.398’N / 103 deg. 37.237’E
7) 01 deg. 14.398’N / 103 deg. 38.755’E
8) 01 deg. 14.550’N / 103 deg. 39.133’E
9) 01 deg. 15.000’N / 103 deg. 38.920’E
10) 01 deg. 15.440’N / 103 deg. 38.709’E
11) 01 deg. 15.678’N / 103 deg. 38.710’E
12) 01 deg. 15.678’N / 103 deg. 38.644’E
13) 01 deg. 15.608’N / 103 deg. 38.644’E
14) 01 deg. 15.608’N / 103 deg. 37.869’E
15) 01 deg. 15.542’N / 103 deg. 37.869’E
16) 01 deg. 15.542’N / 103 deg. 37.546’E
17) 01 deg. 15.608’N / 103 deg. 37.546’E
18) 01 deg. 15.635’N / 103 deg. 37.135’E
19) 01 deg. 15.608’N / 103 deg. 37.135’E
The works will include reclamation, dredging, soil investigation and shore protection removal. Dredging work will be carried out by dredgers which are assisted by tug boats. The dredger will have a circular safety working zone of 70m radius.
Dredged materials will be transported to the designated dumping ground by the hopper barges which are assisted by tug boats.
The soil investigation will involve borehole drilling and vibro-coring using jack-up barge. Tug boats will be used to shift the jack-up barges.
A safety boat will be on attendance to warn and direct craft in the vicinity to keep clear of working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.