10 Jun 2016 / Eden, Australia
Eden chip mill's jetty and convetor system have sustained major storm damage, with parts of the infrastructure washed away by a 'monster wave.
The jetty and conveyor belt were washed away sometime on Sunday night or in the early hours on Monday morning. The extent of the damage was still being assessed but that at least part of the jetty would need to be rebuilt. Inspections show that two centre sections of the jetty, about 100 metres in length, are missing.
For information about operations in Australia contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.