28 Dec 2019 / Mumbai, India
In view of the reduction in the draught at SWB berths due to siltation, the maintenance dredging of these berths (SB-01, SB-02 and SB-03) have been scheduled from today (28 December) from 0700hrs (local time) for a tentative period of four days. According to the Jawaharlal Nehru Port Trust (JNPT) Terminal authorities, no vessels can be berthed at SWB during the dredging. The berths will be released for normal berthing as soon as the dredging work is completed.
For information about operations at Indian ports, contact GAC India at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.