31 Jul 2015 / Australia, Port Kembla
No vessel loading operations will be conducted at Port Kembla Coal Terminal from 0700 on Friday (31 October) until 0700 on 2 November, due to the shutdown of No.1 reclaimer for urgent unscheduled repairs. During the repairs there will be one vessel alongside waiting to resume loading and five vessels at anchorage. The current waiting time is between 7-10 days for most vessels, which is expected to ease by mid-November. For information about operations in Australia contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.