23 Jan 2019 / Dampier, Australia
The Port of Dampier is currently at Cyclone Stage 2 – Prepare, in anticipation of the tropical low(12U) which is currently located offshore north of the Kimberly coast. This tropical low is likely to move in a South Westerly direction and expected to reach a Category 3 intensity tropical cyclone.
Cyclone Stage 2 - Prepare involves extensive communications and consultation between the Dampier Harbour Master, Port Terminal Operators, Port users and Pilots. Operational plans, sailing drafts, tidal requirements and intentions will be discussed and evaluated against possible response scenarios.
Vessel Masters shall ensure:
- Vessel's engines and machinery are fully operational
- Vessel's stability, trim, and propeller immersion are appropriate
- Vessel's manning, stores and bunkers are adequate for departure
- Preparations are made in accordance with their respective cyclone response plan
Terminal/berth operators should ensure that:
- The latest cyclone forecasts are taken into account if planning operations over the coming days
- The response plan accounts for time required for vessel's to clear the port and the approaching tropical system safely
- The wharf areas are inspected for and cleared off / secured for any items that may have the potential to fall into the berth pockets or adjacent areas during periods of strong winds
For further details/updates, and information about operations at Australian ports, contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.