You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
10 Apr 2026 / Singapore
The working period has been extended for the transport of sand at Tuas View extension.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.49 of 2026, the transport will be conducted 24 hours daily – including Sundays and Public Holidays – from 15 April to 14 October, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1. 01° 13.296'N / 103° 37.359'E
2. 01° 13.296'N / 103° 37.902'E
3. 01° 13.296'N / 103° 38.476'E
4. 01° 12.809'N / 103° 38.717'E
5. 01° 12.673'N / 103° 38.522'E
6. 01° 12.973'N / 103° 37.359'E
The work involves transporting and discharging sand material by hopper barges to the working area.
A safety boat will be deployed to warn other craft in the vicinity of the working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control for assistance, if required.
For information about operations in Singapore, contact GAC at [email protected]