31 Jul 2015 / United States, Mobile
There will be a partial blockage of the Mobile River on or about Friday, May 15, 2015 from approximately 0600 until 1300 in the vicinity of the Upper Bay Turning Basin to submerge a dredge pipeline. The pipeline will have risers at the south end of the Pinto Island Terminal and the south end of the APM Terminal. During the operations, there will be limited passing of vessels in that location. The main contact point for the operation is the dredge HENRY A and can be reached on channel 13/16 VHF/FM or by cell phone on the dredge at (985) 703-2246. The contact person for Maintenance Dredging Inc. is Mr. Justin Tassin and can be contacted at (504) 782-0995. (For information about operations in the USA contact GAC USA at [email protected]) Source: Alabama State Port Authority Harbormaster Notice to Shipping No.06-15 dated 12 May 2015
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.