31 Jul 2015 / United Arab Emirates, Port of Fujairah
The new VLCC berth construction started on 3 January 2015 and four temporary Navigation Buoys are deployed at the following positions to identify the construction work area. These buoys will be at their locations until any amendments or further information. All vessels are hereby advised to correct their charts, publications and shall navigate with extreme caution in the vicinity. Any vessels or utility boats or yachts are prohibited from crossing the construction area since the area is engaged with construction barges and anchor buoys. Details of buoys' positions. BUOY No.1 - Position: 25 deg. 10.60'N / 056 deg. 23.40'E - Colour: Red - Light: FL.R BUOY No.2 - Position: 25 deg. 10.96'N / 056 deg. 23.10'E - Colour: Red - Light: FL.R BUOY No.3 - Position: 25 deg. 12.00'N / 056 deg. 23.10'E - Colour: Red - Light: FL.R BUOY No.4 - Position: 25 deg. 11.60'N / 056 deg. 23.00'E - Colour: Red - Light: FL.R Above is effected in the Admiralty Chart Nos.3723 &3709. (For information about operations in Fujairah contact GAC Fujairah at [email protected]) Source: Port of Fujairah Notice to mariner No.187/2015 dated 5 January 2015
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.