21 Feb 2018 / Hong Kong

Temporary Loading Facility at Junk Bay

A temporary loading facility will be established at Junk Bat. The construction and loading operation of the temporary loading facility will last for a period of approximately 19 months.

One tugboat and one dumb lighter will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (1) and the adjacent shoreline for loading:
(A) 22 deg. 17.840’N / 114 deg. 15.216’E
(B) 22 deg. 17.818’N / 114 deg. 15.246’E
(C) 22 deg. 17.819’N / 114 deg. 15.262’E
(D) 22 deg. 17.793’N / 114 deg. 15.319’E
(E) 22 deg. 17.725’N / 114 deg. 15.260’E
(F) 22 deg. 17.752’N / 114 deg. 15.209’E
(G) 22 deg. 17.710’N / 114 deg. 15.177’E
(H) 22 deg. 17.738’N / 114 deg. 15.150’E
(I) 22 deg. 17.761’N / 114 deg. 15.152’E
The hours of operation will be carried out round-the-clock.

(For further details and information about operations in Hong Kong contact GAC Hong Kong at [email protected])

Source: Extract from Government of the Hong Kong SAR Marine Department Notice No.26 of 2018

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon