17 Feb 2017 / Hong Kong
A temporary loading facility will be established at Junk Bay. The construction and loading operation of the temporary loading facility will last for a period of approximately 30 months.
One tugboat and one dumb lighter will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (I) and the adjacent shoreline for loading operation:
(A) 22 deg. 17.840’N / 114 deg. 15.216’E
(B) 22 deg. 17.818’N / 114 deg. 15.246’E
(C) 22 deg. 17.819’N / 114 deg. 15.262’E
(D) 22 deg. 17.793’N / 114 deg. 15.319’E
(E) 22 deg. 17.725’N / 114 deg. 15.260’E
(F) 22 deg. 17.752’N / 114 deg. 15.209’E
(G) 22 deg. 17.710’N / 114 deg. 15.177’E
(H) 22 deg. 17.738’N / 114 deg. 15.150’E
(I) 22 deg. 17.761’N / 114 deg. 15.152’E
The hours of operation will be from 0700 hours to 1900 hours. No operation will be carried out on Sundays and public holidays. Vessels engaged in the operation will stay in the operation area outside the hours of operation.
(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])
Source: Government of Hong Kong SAR Marine Department Notice No.26 of 2017
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.