26 Sep 2017 / Cochin, India
Following the sinking of the fishing vessel in the main shipping channel at the harbour mouth, we are unable to handle ships of over 10m draft. As the wreck is located close to the center line of the channel there is not enough width for the bigger ships to pass through.
The contract for removal of the wreck has been entrusted to a private party and they have been engaged in operations to sling the boat lying at the bottom and thereafter lifting the sunken fishing vessel off the bottom to take it out of the dredged shipping channel. On completion of the wreck removal, the operations will be resumed as before with full draft.
Salvage operations are very complex operations given the difficult environment they are carried out in. Divers work in depths of 15m where there is zero visibility and they are much affected by the flow of water due to tidal movement…
…While the salvage operations are going on we cannot carry out shipping operations as the salvers need to maneuver the crane barge (Ro Ro) as required for the salvage and shipping operations will hinder their operations. So while the salvage operations are ongoing we have restrictions on the time as well as the draft and length of vessel through the channel. The timings are announced in advance to permit scheduling of movements accordingly…
(For information about operations in India contact GAC India at [email protected])
Source: Harbour Master, Cochin Port Trust
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.