28 Jun 2018 / Hong Kong
For approximately 3 weeks, submarine cable repairing operations will be carried out in the area bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (H):
(A) 22 deg. 12.220’N / 114 deg. 23.273’E
(B) 22 deg. 11.999’N / 114 deg. 23.441’E
(C) 22 deg. 11.898’N / 114 deg. 23.237’E
(D) 22 deg. 11.845’N / 114 deg. 22.750’E
(E) 22 deg. 11.845’N / 114 deg. 22.195’E
(F) 22 deg. 12.118’N / 114 deg. 22.195’E
(G) 22 deg. 12.116’N / 114 deg. 22.750’E
(H) 22 deg. 12.167’N / 114 deg. 23.167’E
The works will be carried out by the cable ship “LODBROG”. The cable ship will deploy a remotely operated vehicle to conduct the cable survey and burial works.
A working area of approximately 250 metres will be established around the cable ship.
The hours of work will be round-the-clock.
Diving operations will be carried out from time to time during the hours of work.
Vessels engaged in the operations will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind there are divers working in the works area.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.101 of 2018
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.