09 Jan 2017 / Singapore
With effect from 05 January to 27 May 2017, soil investigation works will be carried out at South of Pulau Tekukor and West of St John's Island, at the following co-ordinates.
(A) 01˚ 13.668' N / 103˚ 50.377' E
(B) 01˚ 13.766' N / 103˚ 50.424' E
(C) 01˚ 13.662' N / 103˚ 50.460' E
(D) 01˚ 12.977' N / 103˚ 50.735' E
(E) 01˚ 12.931' N / 103˚ 50.870' E
(F) 01˚ 13.048' N / 103˚ 50.812' E
(G) 01˚ 12.846' N / 103˚ 50.959' E
(H) 01˚ 12.769' N / 103˚ 50.889' E
(I) 01˚ 12.809' N / 103˚ 50.903' E
(J) 01˚ 12.992' N /103˚ 50.779' E
Works will be carried out 24 hours daily, including Sundays and Public Holidays. The crafts involved include jack-up barges, passenger boat, safety boats, tug boats and work boats. These craft will exhibit the appropriate local and international day and night signals.
Soil investigation work will be carried out by drilling and sampling using a jack-up barge. Tug boats will be used to move the jack-up barges. The safety zone is a circular area of 30m radius centred at the borehole. Safety boats will be deployed in the vicinity to warn other craft about the work.
When in the vicinity of the working area, mariners are reminded to
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.