31 Jul 2015 / Singapore, Singapore
The working period for soil investigation work at Tuas View Extension, off Tuas Explosive Jetty, has been extended. The works will now be conducted from 27 September 2014 to 26 March 2015. According to the Maritime and Port Authority of Singapore's Port Marine Notice No.119 of 2014, the works will be conducted 24 hours daily - including Sundays & Public Holidays - within a working area bounded by the following Marine borehole co-ordinates (WGS 84 Datum): BH1) 1� 16.623'N / 103� 36.672'E BH2) 1� 16.610'N / 103� 36.690'E BH3) 1� 16.605'N / 103� 36.661'E BH4) 1� 16.594'N / 103� 36.681'E BH5) 1� 16.585'N / 103� 36.652'E BH6) 1� 16.576'N / 103� 36.672'E BH7) 1� 16.429'N / 103� 36.599'E BH8) 1� 16.423'N / 103� 36.615'E BH9) 1� 16.403'N / 103� 36.590'E BH10) 1� 16.397'N / 103� 36.606'E BH11) 1� 16.378'N / 103� 36.581'E BH12) 1� 16.372'N / 103� 36.597'E BH13) 1� 16.352'N / 103� 36.571'E BH14) 1� 16.346'N / 103� 36.587'E BH15) 1� 16.327'N / 103� 36.562'E BH16) 1� 16.321'N / 103� 36.578'E BH17) 1� 16.301'N / 103� 36.553'E BH18) 1� 16.295'N / 103� 36.568'E BH19) 1� 16.276'N / 103� 36.543'E BH20) 1� 16.270'N / 103� 36.559'E BH21) 1� 16.250'N / 103� 36.534'E BH22) 1� 16.244'N / 103� 36.550'E BH23) 1� 16.225'N / 103� 36.524'E BH24) 1� 16.219'N / 103� 36.540'E BH25) 1� 16.200'N / 103� 36.515'E BH26) 1� 16.194'N / 103� 36.531'E BH27) 1� 16.174'N / 103� 36.506'E BH28) 1� 16.168'N / 103� 36.522'E BH29) 1� 16.149'N / 103� 36.496'E BH30) 1� 16.143'N / 103� 36.512'E BH31) 1� 16.123'N / 103� 36.487'E BH32) 1� 16.117'N / 103� 36.503'E Soil investigation work will be carried out by means of borehole drilling using jack-up barges. One jack-up barge will be working on only oneborehole at a time. The jack-up barge, with tug boats in attendance, will have a circular safety working zone of 30 meters radius centered at the barge. Tugboats will be used for shifting the barge from one borehole location to another. Safety boats will be deployed in the vicinity of the working areas to warn other craft of the project work. Craft involved in the works will exhibit the appropriate local and international day and night signals. When in the vicinity of the working area, mariners are reminded to: (a) keep well clear and not to enter the working area; (b) maintain a proper lookout; (c) proceed at a safe speed & navigate with caution; (d) maintain a listening watch on VHF channel 22 (West Jurong Control); and (e) communicate with West Jurong Control on VHF 22 for assistance, if required. For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.