10 Apr 2017 / Singapore
From 10 to 24 April, silt removal works are being conducted in the ALGAS anchorage.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.57 of 2017, the work is being carried out between 0700 and 1900 hours daily - including Sundays and Public Holidays - within the working area bounded by the following coordinates (WGS 84 Datum):
1) 01 deg. 14.370'N / 103 deg. 39.216'E
2) 01 deg. 14.120'N / 103 deg. 39.332'E
3) 01 deg. 13.999'N / 103 deg. 39.074'E
4) 01 deg. 14.249'N / 103 deg. 38.957'E
Silt removal on a wreck will be carried out by a dredger. A safety boat will be deployed in the vicinity to warn other craft about the work.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a slow speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.