You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
15 Aug 2025 / Jawaharlal Nehru Port, India
BPCL Liquid Cargo Terminal (LB01 & LB02), will be shut down in two phases for strengthening of pipeline trestle and pipeline’s extension from LB01/LB01 to LN03/LB04.
First Phase:
From 9 September to 11 September
Second Phase:
From 6 October to 8 October
During this shutdown period, no vessel operations will be carried out at LB-01 and LB-02, as the strengthening works have been meticulously planned and vendors have been mobilized accordingly. However, JJLTPL berths LB-03 and LB-04 will remain operational during this time…
..No requests for vessel placement at LB-01 and LB-02 during the shutdown period will be entertained.
Tank farm operators are encouraged to utilise this window to undertake amy pending maintenance or works related to pipeline systems, ensuring minimal disruption.
(For information about operations in India, contact GAC India at [email protected])
Source: Jawaraharlal Nehru Port Authority JNPA/Traffic/BPCL-JJLTPL/TN/2025/219