02 Apr 2016 / Panama Canal, Panama
Effective April 29, 2016, the maximum authorized transit draft will be set at 11.74, (38.5 feet), Tropical Fresh Water (TFW), as follows:
As in the past, draft restrictions will be implemented in 15-centimeter (six-inch) decrements at a time, with each restriction announced at least four weeks in advance. Vessels alreadt loaded to the prevailing draft limitation at the time of announcing the new draft restriction will have this restriction waived for transit, subject to safety considerations.
The maximum authorized transit draft is the deepest point immersion in TFW allowed for a particular vessel in Gatun Lake, which has a density of 0.9954 at 29.4 deg. C (85 deg F). However, vessels shall arrive at Canal with no list.
The Panama Canal Authority will eliminate these draft restrictions as soon as Gatun Lake level returns to normal.
(For information about operations in the Panama Canal, contact GAC-Wilford & McKay at [email protected])
Source: Panama Canal Authority Advisory to Shipping No.A-14-2016 dated April 1, 2016
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.