31 Jul 2015 / Hong Kong, Hong Kong
For approximately 4 months, seawall reinstatement works will be carried out [at the Yacht Club inside Causeway Bay Typhoon Shelter] within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22 deg. 17.034'N / 114 deg. 10.995'E (B) 22 deg. 17.033'N / 114 deg. 11.006'E (C) 22 deg. 16.995'N / 114 deg. 10.999'E (D) 22 deg. 16.997'N / 114 deg. 10.988'E The works will be carried out by a flotilla of vessels including one derrick barge, two tugs and two work boats. The number of vessels engaged in the works will change from time to time to suit operational requirements. A working area of approximately 15 metres around the barge will be established. Diving operations will be carried out from time to time during the hours of work. The hours of works will be from 0700 to 2300 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. Vessels engaged in the operations will display signals as prescribed in international and local regulations. Vessels navigating in the vicinity should proceed with caution and keep clear at slow speed, bearing in mind there are divers working in the area. (For information about operations in Hong Kong contact GAC Hong Kong at [email protected]) Source: Government of Hong Kong SAR Marine Department Notice No.168 of 2014
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.