28 Mar 2019 / Hong Kong
For approximately 6 months, seawall reinstatement works [are being] carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22 deg. 10.811’N / 113 deg. 55.009’E
(B) 22 deg. 10.796’N / 113 deg. 55.061’E
(C) 22 deg. 10.736’N / 113 deg. 55.038’E
(D) 22 deg. 10.750’N / 113 deg. 54.995’E
The works [are being] carried out by a derrick lighter. One tugboat will provide assistance.
A working area of approximately 15 metres around the derrick lighter is established. Yellow marker buoys fitted with yellow flashing lights are laid to mark the positions of the anchors extending from the derrick lighter.
The hours of work are from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work.
A silt curtain fitted with yellow flashing lights will be established within the works area. The silt curtain is a large piece of netting used to contain mud and sediments.
Vessels engaged in the operations will display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.53 of 2019
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.