18 Feb 2019 / Hong Kong
From 25 February and for approximately 4 months, seawall reinstatement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22 deg. 22.633’N / 114 deg. 16.468’E
(B) 22 deg. 22.627’N / 114 deg. 16.497’E
(C) 22 deg. 22.563’N / 114 deg. 16.481’E
(D) 22 deg. 22.569’N / 114 deg. 16.453’E
The works will be carried out by one derrick lighter and one crane boat. One tugboat and one work boat will provide assistance.
A working area of approximately 15 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter.
Silt curtains, extending from the sea surface to the seabed, will be established within the works area. The silt curtain is a large piece of netting used to contain mud and sediments. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains.
The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work.
Vessels engaged in the operations will display signals as prescribed in international and local regulations.
(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.32 of 2019
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.