05 Mar 2019 / Hong Kong
For a period of approximately 10 weeks, seawall reinstatement works [are being] carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22 deg. 14.360’N / 114 deg. 08.953’E
(B) 22 deg. 14.325’N / 114 deg. 08.917’E
(C) 22 deg. 14.376’N / 114 deg. 08.861’E
(D) 22 deg. 14.404’N / 114 deg. 08.891’E
The works [are being] carried out by one dumb lighter. One tugboat provides assistance.
A working area of approximately 30 metres around the lighter [is] established. Yellow marker buoys fitted with yellow flashing lights [are] laid to mark the positions of the anchors extending from the lighter.
The hours of work [are] from 0700 to 1900 hours. No works [are being] carried out on Sundays and public holidays. Vessels employed for the works stay in the works area outside the hours of work.
Vessels engaged in the operations display signals as prescribed in international and local regulations.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.38 of 2019
You are currently on GAC Worldwide website.
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
GAC Netherlands Rotterdam Main Office Mercuriusstraat 44
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.