11 Jan 2016 / Hong Kong

Seawall modification works for seawater intake culverts

From 11 January and for approximately 5 months, seawall modification works for seawater intake culverts will be carried out [at West Kowloon Cultural District] within the works area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22 deg. 18.047’N / 114 deg. 09.899’E
(B) 22 deg. 18.045’N / 114 deg. 09.900’E
(C) 22 deg. 18.039’N / 114 deg. 09.845’E
(D) 22 deg. 18.040’N / 114 deg. 09.844’E

The works will involve diving operations from time to time using the abutting seawall as the base of operation. One guard boat will provide assistance.

Two silt curtains at the seawall, extending from the sea surface to the seabed, will be established within the works area. Each silt curtain is a large piece of netting used to contain mud and sediments. Yellow marker buoys fitted yellow flashing lights will be laid along the surface of the silt curtain to mark the extent of the silt curtain.

The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. The guard boat employed for the works will not stay in the works area outside the hours of work.

The guard boat engaged in the works will display signals as prescribed in international and local regulations.

Vessels navigating in the vicinity should proceed with caution and keep clear at slow speed, bearing in mind there are divers working in the area.

(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon