11 May 2018 / Hong Kong

Seawall inspection works at Ap Lei Chau

For approximately 1 month, seawall inspection works [are being] carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline:
(A) 22 deg. 14.364’N / 114 deg. 08.938’E
(B) 22 deg. 14.335’N / 114 deg. 08.907’E
(C) 22 deg. 14.372’N / 114 deg. 08.868’E
(D) 22 deg. 14.399’N / 114 deg. 08.897’E

The works [are being] carried out by a work boat. A working area of approximately 10 metres around the work boat [is] established.

The hours of work [are] from 0700 to 1900 hours. No works [are being] carried out on Sundays and public holidays. Vessel employed for the works will not stay in the works area outside the hours of works.

Diving operations [are being] carried out from time to time during the hours of work.

Vessel engaged in the operations displays signals as prescribed in international and local regulations.

Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind there are divers working in the works areas.

(For information about operations in Hong Kong contact GAC Hong Kong at [email protected])

Source: Government of the Hong Kong SAR Marine Department Notice No.75 of 2018

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon