You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
26 Jun 2017 / Bosphorus, Turkey
Closures can be expected in the Bosphorus until early August due to seabed studies being carried out for the Great Istanbul Tunnel project.
The Great Istanbul Tunnel is a multi-level underwater tunnel to connect European and Asian banks of Istanbul, planned between the first and second bridges connecting Gayrettepe and Kucuksu.
From 24 June to 3 August, the tug Alcatras and research vessel Fugro Scout are studying the seabed in the Bosphorus and closures are to be expected. Details of closure dates/times have not been announced yet, and will be given nearer the time.
For information about operations in the Turkish Straits, contact GAC Istanbul at [email protected]