27 Sep 2016 / Singapore

Revised tug assignment guidelines for mega-container ship at container terminals

The Maritime and Port Authority of Singapore (MPA) has revised the tug assignment guidelines to enhance navigational safety in the port.

Details of the revised tug assignment guidelines can be found in the pilotage guidelines for the respective container terminals at the following links:

a. Tanjong Pagar, Keppel Harbour, and Brani Terminals http://www.mpa.gov.sg/web/wcm/connect/www/d8bbaa88-7558-4925-82c2-2ff9351a1065/tanjongpagar_keppel_brani_terminals.pdf?MOD=AJPERES

b. Pasir Panjang Terminal http://www.mpa.gov.sg/web/wcm/connect/www/f5206701-1174-4648-837b-9ea39bb920a1/pasir_panjang_terminal.pdf?MOD=AJPERES

c. Jurong Terminal http://www.mpa.gov.sg/web/wcm/connect/www/e19a9068-5ca8-4f20-9fba-ba3413922187/jurong_terminal.pdf?MOD=AJPERES

For information about operations in Singapore contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon