31 Jul 2015 / Australia, Port Hedland
Based on the latest hydrographical surveys of the harbour, the promulgated depths at berths as of 20 April 2015 within the port of Port Hedland are as follows: PHPA No.1 Berth: 13.10m CD PHPA No.2 Berth: 13.10m CD PHPA No.3 Berth: 13.50m CD PHPA No.4 Berth (UTAH Point: 14.60m CD BHP Billiton Nelson Point A Berth (NPA): 19.20m CD BHP Billiton Nelson Point B Berth (NPB): 19.00m CD BHP Billiton Nelson Point C Berth (NPC): 19.10m CD BHP Billiton Nelson Point D Berth (NPD): 19.00m CD BHP Finucane Island A Berth (FIA): 19.20m CD BHP Finucane Island B Berth (FIB): 19.20m CD BHP Finucane Island C Berth (FIC): 18.40m CD BHP Finucane Island D Berth (FIA): 19.20m CD FMG Anderson Point Berth 1 (AP1): 19.80m CD FMG Anderson Point Berth 2 (AP2): 19.70m CD FMG Anderson Point Berth 3 (AP3): 19.80m CD FMG Anderson Point Berth 4 (AP4): 19.60m CD FMG Anderson Point Berth 5 (AP5): 18.80m CD The Master or agent of any vessel intending to load to a draft within 1 (one metre of the promulgated depth at the above berths is required to notify the Harbour Master of that fact prior to berthing. (For information about operations in Australia contact GAC Australia at [email protected]) Source: Pilbara Ports Authority � Port Hedland Local Marine Notice No,08/15 dated 20 April 2015
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.