07 Mar 2017 / Port Kembla, Australia
Following dredging and remediation works, the revised depths & transit draft at Berth 203 (outer harbour) are as follows:
- Berth declared depth: 10.05m
- Max permissible draft alongside: Max Draft = 10.05m+tide-0.6m
- Transit draft 9.9m (vessels berthing at chainage less than 190m), 9.6m (vessels berthing up to chainage 220m)
- Max transit draft = (declared transit draft+ tide)/1.08
For information about operations in Australia contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.