27 Aug 2020 / Port Kembla, Australia

Revised air draft and operational guidelines

Port Kembla Coal Terminal (PKCT) has advised revised air draft and operational guidelines for loading sequence at Coal Berth 102:-

Air draft - 20.40m

Loading sequence - maximum allowable Hatch passes is one full hatch pour (single pour) followed by two pours per remaining hatches in addition to two final trim passes. Trim passes will not load less than 150 tonnes per hold.

For information about operations in Australia, contact GAC Australia at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon