19 Nov 2019 / Singapore
On 20 and 21 November, work will be carried out to replace the lightning protection cable for the cable car system at Cruise Bay.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.116 of 2019 dated today (19 November), the work will be conducted between 0001 and 0600 hours on each day between the working line bounded by the following co-ordinates (WGS 84 Datum):
A) 01 deg. 15.870'N / 103 deg. 49.120'E
B) 01 deg. 15.584'N / 103 deg. 49.088'E
Lightning protection cable replacement will be carried out from the cable car towers between HarbourFront and Sentosa Island. During the replacement work, the lightning protection cable for the cable car system will be lowered and maintained at a height of 45m above sea level.
When in the vicinity of the working area, mariners are reminded to:
a) Maintain a proper lookout;
b) Proceed at a safe speed and to navigate with caution;
c) Maintain a listening watch on VHF Channel 5 (Cruise Bay Control);
and
d) Communicate with Cruise Bay Control on VHF Channel 5 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.