31 Jul 2015 / Singapore, Singapore
From 30 May to 29 November, repair works will be carried out to the revetment seawall and drain outfalls at Sungei Jurong. According to the Maritime and Port Authority of Singapore Port Marine Notice No.77 of 2014 dated 29 May 2014, the works will be conducted between 0800 and 1800 hours daily � including Sundays & Public Holidays � within the working area bounded by the following coordinates (WGS 84 Datum): 1) 01� 19.048'N / 103� 43.720'E 2) 01� 19.035'N / 103� 43.744'E 3) 01� 19.026'N / 103� 43.739'E 4) 01� 19.039'N / 103� 43.715'E The repair and restoration works will entail sorting, leveling and pitching of existing drain outfalls. The works will be carried out by excavators and the materials for the restoration work will be provided by the work barge. Craft will exhibit the appropriate local and international day and night signals. When in the vicinity of the working area, mariners are reminded to: (a) keep well clear and not to enter the working area; (b) maintain a proper lookout; (c) proceed at a safe speed & navigate with caution; (d) maintain a listening watch on VHF Channel 25 ( Pasir Panjang Control); and (e) communicate with Pasir Panjang Control on Channel 25 for assistance, if required. For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.