08 Sep 2016 / Hong Kong

Repair works for cable landing point at North Point

With immediate effect and for a period of approximately one month, repair works will be carried out within the area bounded by straight lines joining the following co-ordinates from (A) to (D) and the adjacent shoreline:

(A) 22 deg. 17.600’ N / 114 deg. 12.011’ E

(B) 22 deg. 17.608’ N / 114 deg. 12.009’ E

(C) 22 deg. 17.613’ N / 114 deg. 12.033’ E

(D) 22 deg. 17.605’ N / 114 deg. 12.035’ E

The works will be carried out by a work boat. A working area of approximately 15 metres around the work boat will be established. The hours of work will be from 0800 to 1700 hours. No works will be carried out on Sundays and Public Holidays. The vessel employed for the works will not stay in the works area outside the hours of work.

Diving operations will be carried out from time to time during the hours of work.

The vessel engaged in the works will display signals as prescribed in international and local regulations.

Vessels navigating in the vicinity should proceed with caution, bearing in mind there are divers working in the area.

For information about operations in Hong Kong contact GAC Hong Kong at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon