31 Jul 2015 / Singapore, Singapore
From 24 December 2014 to 16 January 2015, repair works will be carried out at the Second Bukom Beacon, off Jong Fairway. According to the Maritime and Port Authority of Singapore Port Marine Notice No.161 of 2014, the work will be conducted between 0800 and 1900 hours daily - including Sundays & Public Holidays - within the working area bounded by the following coordinates (WGS 84 Datum): 1) 01�� 14.223'N / 103�� 46.423'E 2) 01�� 14.210'N / 103�� 46.489'E 3) 01�� 14.134'N / 103�� 46.489'E 4) 01�� 14.134'N / 103�� 46.414'E 5) 01�� 14.180'N / 103�� 46.400'E Repair work involves replacing of platforms and steel piles. A safety boat will be on the lookout during the operation to keep vessels from entering the work area. Craft involved in the works will exhibit the appropriate local and international day and night signals. When in the vicinity of the working area, mariners are reminded to: a) Keep well clear and not to enter the working area; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 68 (West Control); and e) Communicate with West Control on VHF Channel 68 for assistance, if required. For information about operations in Singapore contact GAC Singapore at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.