You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
23 Jan 2026 / Singapore
Marine soil investigation work for the reconstruction of Finger Pier and Raffles Pier at the existing shipyard is being carried out until 17 June.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.14 of 2026, the work is being conducted 24 hours daily - including Sundays and public holidays - at sea, within the working area bounded by the following coordinates (WGS 84 Datum):
WORKING AREA A
1) 01 deg. 17·988'N / 103 deg. 39·290'E
2) 01 deg. 17·884'N / 103 deg. 39·169'E
3) 01 deg. 17·864'N / 103 deg. 39·185'E
4) 01 deg. 17·975'N / 103 deg. 39·314'E
WORKING AREA B
5) 01 deg. 17·819'N / 103 deg. 39·358'E
6) 01 deg. 17·754'N / 103 deg. 39·282'E
7) 01 deg. 17·733'N / 103 deg. 39·300'E
8) 01 deg. 17·798'N / 103 deg. 39·376'E
Soil investigation works will be carried out by means of borehole drilling using jack-up barge. The work barge, with tugboats in attendance, will have a circular safety working zone of 30 meters radius centred at the barge.
Tugboats will be used for shifting the barges from one borehole location to another. The shifting of the barges will be carried out during daylight hours only.
A safety boat will be deployed in the vicinity of the working area to warn other craft of the project work.
Craft involved in the works exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area.
b) Maintain a proper lookout.
c) Proceed at a safe speed and navigate with caution.
d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and communicate with Jurong Control for assistance as required.
For information about operations in Singapore. Contact GAC Singapore at [email protected]