07 Oct 2015 / Singapore
The working period for reclamation work at the western part of Tuas View Extension has been extended.
The work is now being carried out 24 hours daily - including Sundays and Public Holidays – until 4 April 2016, within the working area bounded by the following coordinates (WGS 84 Datum):
1) 01 deg. 16.767'N / 103 deg. 36.735'E
2) 01 deg. 15.745'N / 103 deg. 36.355'E
3) 01 deg. 15.659'N / 103 deg. 36.342'E
4) 01 deg. 15.659'N / 103 deg. 36.169'E
5) 01 deg. 16.427'N / 103 deg. 36.452'E
6) 01 deg. 16.815'N / 103 deg. 36.595'E
The reclamation work will include soil improvement, shore protection, sand filling, and construction of rock revetment.
Excavation will be carried out by grab dredgers.
Sand filling will be carried out by crane barges and flat top barges.
Craft involved in the work will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
(For information about operations in Singapore contact GAC Singapore at [email protected])
Source: Maritime and Port Authority of Singapore Port Marine Notice No.124 of 2015
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.