03 May 2016 / Singapore

Reclamation work at Tuas View, of Temasek Fairway

From 1 May to 31 October, at Tuas View, reclamation work is being conducted at Tuas View, off Temasek Fairway.

According to the Maritime and Port Authority Port Marine Notice No.43 of 2016, the work is being carried out 24 hours daily – including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 16.297'N / 103 deg. 38.387'E
2) 01 deg. 16.297'N / 103 deg. 38.709'E
3) 01 deg. 15.415'N / 103 deg. 38.709'E
4) 01 deg. 15.415'N / 103 deg. 37.255'E

The reclamation work involves the caisson installation, rock mound works, removal of existing stone shore protection, dredging and underwater blasting at basin and sand key trench.

Safety boats will be deployed to warn other craft in the vicinity of the working area of the project.

Craft involved in the works will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.

For information about operations in Singapore contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon