You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
20 Aug 2025 / Singapore
The working period for Pulau Ubin shoreline and mangrove restoration work has been extended, and the work is now being conducted until 3 January 2026.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.104 of 2025, the work is being carried out between 0800 and 1900 hours local time daily - including Sundays and Public Holidays - along the shores of Pulau Ubin, within the working areas bounded by the following co-ordinates (WGS 84 Datum):
Working Area A- (Sungai Besar)
1) 1 deg .25.076”N / 103 deg. 57.460”E
2) 1 deg. 25.091”N / 103 deg. 57.463”E
3) 1 deg. 25.083”N / 103 deg. 57.595”E
4) 1 deg. 25.059”N / 103 deg. 57.595”E
Working Area B- (Noordin Beach)
1) 1 deg. 25.064”N / 103 deg. 57.710”E
2) 1 deg. 25.120”N / 103 deg. 57.710”E
3) 1 deg. 25.185”N / 103 deg. 57.905”E
4) 1 deg. 25.188”N / 103 deg. 58.087”E
5) 1 deg. 25.153”N / 103 deg. 58.087”E
Working Area C - (Mamam Beach)
1) 1 deg. 25.093”N / 103 deg. 58.439”E
2) 1 deg. 25.155”N / 103 deg. 58.450”E
3) 1 deg. 25.105”N / 103 deg. 58.733”E
4) 1 deg. 25.115”N / 103 deg. 58.840”E
5) 1 deg. 25.077”N / 103 deg. 58.840”E
Working Area D - (Sungai Durian)
1) 1 deg. 24.497”N / 103 deg.58.719”E
2) 1 deg. 24.483”N / 103 deg. 58.726”E
3) 1 deg. 24.402”N / 103 deg. 58.608”E
4) 1 deg. 24.408”N / 103 deg. 58.600”E
Construction works along the shoreline will be carried out by work barges, assisted by tugboats.
A safety boat will be in attendance at all times to warn and direct craft in the vicinity to keep clear of the working areas.
Craft involved in the works exhibit the appropriate local and international day and night signals.
When in the vicinity of the respective working areas, mariners are reminded to:
a) Keep well clear and not to enter the working areas;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 21 (Sembawang Control); and Communicate with Sembawang Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]