You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
31 Jul 2015 / Italy, Trieste
The SIOT/TAL Terminal at Trieste has advised that the TAL Pre-Mooring Safety Inspection program will be modified from 1 September. The checks at road will affect: - Any ship at her first call at S.I.O.T. Terminal - Any ship of 15 years old or less, if the previous check is older than 1 year - Any ship aged more than 15 years, if the previous check is older than 6 months - Any ship in TAL Warning List - Any ship in TAL Refusal List, on trial voyage. In case of reduced Terminal berth capability (for example with a pier unavailable), any ship the Terminal should judge advisable to be checked in order to reduce the risk of prolonged berthing time (for example in case of overcrowd Trieste road, in case of vessels with heated cargo onboard, subjected recently to incident, that exceed the max. allowable berthing time at the previous call and so on). (For information about operations in Italy, contact the GAC UK Hub Agency Centre at [email protected])