21 Jun 2017 / Beaumont, Port Arthur, Orange & Lake Charles, United States
Effective at 6:00pm DT, the U.S. Coast Guard Captain of the Port, Port Arthur has set Port Condition X-RAY for the ports of Beaumont, TX; Port Arthur, TX; Orange, TX; and Lake Charles, LA including all tributaries and connecting waterways.
Tropical force winds from TROPICAL STORM CINDY are expected to make landfall along the coast of southeast Texas and western Louisiana within 48 hours.
The following restrictions are in effect:
…Vessels are advised to seek safe harbor in the northern reaches of the waterway. Survey places to moor or anchor to safely ride out a tropical storm or hurricane, and make available the necessary heavy weather mooring gear. Based on prior experience fishing vessels should moor north of Texaco Island Intersection. Vessels shall not moor in locations that impede the safe transit of vessels in the channel. By regulation, vessels intending to moor at 33 CFR 105 facilities must have an agreed upon security arrangement with the facility prior to the vessels mooring.
Future Port Conditions cannot be predicted with any degree of certainty but, provided the storm remains on the projected course and speed, port stakeholders can expect the following progression of Port Conditions:
WHISKEY
Set at 10.30am on 20 June 2017
X-RAY
Set at 6.00pm on 20 June 2017
YANKEE
Predicted to be set am 21 June 2017
ZULU
Predicted to be set pm 21 June 2017
Arrival of Tropical Force winds
Predicted am 22 June 2017
(For information about operations in the USA contact GAC USA at [email protected])
Source: U.S. Coast Guard, Beaumont, Marine Safety Information Bulletin 04-17 issued at 6:00pm on 20 June 2017
UPDATE:Effective at 8:00 a.m. CDT, June 21, 2017, the U.S. Coast Guard Captain of the Port, Port Arthur has set Port Condition YANKEE for the ports of Beaumont, TX; Port Arthur, TX; Orange, TX; and Lake Charles, LA including all tributaries and connecting waterways.
Tropical force winds from TROPICAL STORM CINDY are expected to make landfall along the Texas/Louisiana coast with within 24 hours.
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.