31 Jul 2015 / Angola, Soyo
A new finger pier has been constructed in the Port of Soyo at the following location: Lat 6 deg. 06.95�S, Long 12 deg. 20.55�E; Lat 6 deg. 06.96�S, Long 12 deg. 20.56�E; Lat 6 deg. 07.10S, Long 12 deg. 20.50�E; Lat 6 deg. 07.11�S, Long 12 deg. 20.51E. A navigation light is fitted at the northern end of the pier with characteristic 2 Fl R (vert). The finger pier is the operating base for the Angola LNG marine services provider, Svitzer Angola Lda. For information about operations in Angola contact GAC Angola at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.