New regulations and tariff at Taboneo

29 Apr 2019 / Taboneo, Banjarmasin port - Indonesia

Banjarmasin Port Authority has appointed PT. Indonesia Multi Purpose Terminal (IMPT) port operator at Taboneo, Banjarmasin. IMPT have introduced an integrated Loading Point Service fee with effect from 10 May 2019 as follows:

LOADING POINT SERVICES = [USD.106 x 2 (IN/OUT)] + [GRT x 0.037 x 2 (IN/OUT)]

Integrated Loading Point Service is applicable to vessels that operate at Taboneo Floating terminal as follows:

1. Direct the ships to the specific / appointed loading point using the ECDIS Radar and VHF Radio communication (Ch 16, 71, and 74).
2. Direct the ships to loading point in the concession area and from loading point out of the concession area.
3. Manage the ships movements (tug and barge and Transhipment Equipment).

Taboneo floating crane facilities are available as follows:
a. Supporting Navigation Safety.
b. Implementation of the International Ship and Port Facility Security (ISPS) Code.
c. Availability of the First Aid Post Clinic (24/7) and paramedic at the Floating Office Permata Barito.
d. Environmental Management in the Concession Area in accordance with the Environmental Permit.

For information about operations in Indonesia contact PT Andhika GAC at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.