31 Jul 2015 / Argentina, Necochea
The Argentinean Coast Guard has established new restrictions for entering/sailing Necochea port. The new maximum LOA is now 190 metres. Further, vessels must arrive with a maximum draft 10.60 metres and sail with max draft 12.20 metres. Maneuvering is only allowed with over 1.20 metres tide. (For information about operations in Argentina contact the GAC USA Hub Agency Center at [email protected]) Source: AMI Argentina - GAC agent
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.