31 Jul 2015 / India, Mundra
Mundra Port Authorities have advised the revised draft at berths and minimum depths in the approach channel and turning circle for the month of August, as follows: The minimum depth in the MICT container approach channel and turning circle is 14.0 metres at Chart Datum. The minimum depth in the South basin approach channel and turning circle is 14.1 metres at Chart Datum. The minimum depth in the West Basin approach channel 14.4 metres at Chart Datum. The new minimum depths are as follows: B-1: 14.1m (increase) B-2: 13.0m B-3: 13.7m (decrease) B-4: 13.0m (decrease) B-5: 14.1m (increase) B-6: 16.0m B-7: 12.0m B-8: 10.5m B-9: 13.0m (decrease) B-10: 13.7m (increase) B-11: 13.6m (increase) B-12: 14.5m (increase) WB-1: 17.5m WB-2: 17.3m WB-3: 17.3m MICT CB1: 14.2m (increase) MICT CB2: 14.3m (decrease) - Only up to bollard 32 AMCT CB3: 14.1m (increase) AMCT CB4: 14.1m (increase) - Only up to bollard 31. SB-6: 14.5m (decrease) SB-7: 14.3m (decrease) For information about operations in India contact GAC India at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.