31 Jul 2015 / Australia, Townsville
The new joint venture berth facility between Glencore, Incitec Pivot, and the Port of Townsville is now operational. The $85 million Berth 8 facility allows for two and a half more times shiploading capacity at the port, increased berth efficiency, and improves the site�s sustainability, with around $5 million of the total project cost focused solely on improving environmental performance. This includes better water management and treatment, enclosed conveyors, and dust collection systems along multiple points of the logistics network. For information about operations in Australia contact GAC Australia at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.