You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
06 May 2025 / Tuticorin, India
V.O. Chidamabaranar Port Authority has entered into a Concession Agreement with JSW Tuticorin Multipurpose Terminal for mechanisation of NCB-III on DBFOT basis for handling dry bulk cargo (coal/coke, limestone, gypsum, rock phosphate and copper concentrate…
…The following berthing parameters are applicable at NCB-III for JSW TMTPL to commence interim operations with immediate effect:
- Quay length: 360 metres
- Maximum permissible LOA: 260 metres
- Maximum permissible beam: 48 metres
- Maximum draft: 14.20 metres (ships of draft of 14.0 metres and above will be berthed on tide only)
- Maximum permissible DWT: 95,000
(For information about operations in India, contact GAC India at [email protected])
Source: V.O Chidamabaranar Port Authority Trade Notice dated 3 May 2025