31 Jul 2015 / United States, Delaware River
The vertical clearance on the Betsy Ross Bridge is reduced by 5 feet and 2 inches due to the installation of four work platforms that measure 18 feet wide and 12 feet long. The platforms are installed on both the north and south side of the bridge at locations 283.5 deg. and 364.5 deg. west of the Pennsauken, New Jersey tower. A flashing red light will be positioned at the corners of each platform. No welding or burning will be performed over the waterway. For information about operations in the USA contact GAC USA at [email protected]
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.