07 Mar 2017 / Panama Canal, Panama
The Panama Canal Authority (ACP) would like to remind its customers that Section 9 of OP NOTICE TO SHIPPING No. N-1-2017 “Vessel Requirements” states that vessels are required to have six manila or synthetic mooring lines forward and six aft, in good condition prior to commencing transit.
In addition, vessels transiting the Neopanamax locks are required to have four of the six lines forward and four of the six lines aft, in drums, and ready for use.
These lines shall be at least 75 m (250 feet) in length and shall have an eye of at least 1.50 m (five feet) spliced in one end. The size and strength of these lines shall be suitable for the vessel’s size in order to safely dock, moor at a lock approach wall, or secure the vessel in a lock chamber.
Non-compliance with this transit requirement has significant impact in our transit operations. Therefore, failure to comply shall be promptly reported to Canal authorities.
(For information about operations in the Panama Canal contact GAC-Wilford & McKay at [email protected])
Source: Panama Canal Authority Advisory to Shipping No.A-08-2017
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.