You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
05 Apr 2016 / Singapore
During the period 2 April to 1 October, bulk carriers, self-propelled barges and tug boats with barges in composite unit carrying bulk sand will be transiting Kuala Johor to the Pulau Tekong reclamation project area.
Masters of vessels and harbour craft shall keep a proper lookout for these vessels, proceed at a safe speed and navigate with extra caution when in the vicinity of the mooring buoys off Pulau Tekong.
As advised in the Maritime and Port Authority of Singapore Port Marine Notice No.31 of 2016, mooring and unmooring of vessels will be carried out during daylight hours (0700hrs to 1900hrs).
The locations of the mooring buoys are as follows (WGS 84 Datum):
TK-MB-1) 01 deg. 20.266’N / 104 deg. 04.727’E (Fl.Y.2s)
TK-MB-2) 01 deg. 20.394’N / 104 deg. 04.589’E (Fl.Y.2s)
TK-MB-3) 01 deg. 22.008’N / 104 deg. 02.667’E (Fl.Y.4s)
TK-MB-4) 01 deg. 22.133’N / 104 deg. 02.521’E (Fl.Y.4s)
TK-MB-5) 01 deg. 22.305’N / 104 deg. 02.312’E (Fl.Y.6s)
TK-MB-6) 01 deg. 22.433’N / 104 deg. 02.158’E (Fl.Y.6s)
The mooring buoys will be removed upon completion of the reclamation.
For information about operations in Singapore contact GAC Singapore at [email protected]