28 Aug 2017 / Panama Canal, Panama
Since the beginning of the 2017 rainy season, the rainfall within the Panama Canal hydrographic basin has allowed the water levels in Canal reservoirs to be gradually increased.
Based on the current and projected level of Gatun Lake for the upcoming weeks, effective September 2, 2017, the maximum allowable draft for vessels transiting the Neopanamax locks will be increased to 14.02m (46.0 feet) Tropical Fresh Water (TFW).
Gatun Lake level projections are based on historical precipitation patterns, and should allow us the increase the draft over the next few months. Likewise, as the dry season looms in January 2018 and the lake level starts to drop, it may become necessary to adjust the maximum draft levels permitted for Neopanamax vessels in keeping with this cyclical rainfall occurrence. Future updates to the maximum allowable draft will be announced in a timely manner.
(For information about operations in the Panama Canal contact GAC-Wilford & McKay at [email protected])
Source: Panama Canal Authority Advisory to Shipping No.A-30-2017 dated 25 August 2017
You are currently on GAC Worldwide website.
Group Vice President, Europe and Africa
16200 Central Green Blvd
78 Shenton Way #09-01 Singapore 079120
Group Vice President, Europe and Africa
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.