08 Oct 2025 / Singapore

Marine construction work at Tanjong Kling

Marine construction works are being carried out at Tanjong Kling until 31 December.

According to the Maritime and Port Authority of Singapore Port Marine Notice No.131 of 2025, the work is being conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01° 18.251'N / 103° 42.085'E
2) 01° 18.053'N / 103° 42.093'E
3) 01° 18.065'N / 103° 42.370'E
4) 01° 18.033'N / 103° 42.370'E
5) 01° 18.040'N / 103° 42.593'E
6) 01° 18.410'N / 103° 42.582'E
7) 01° 18.412'N / 103° 42.618'E
8) 01° 18.487'N / 103° 42.617'E

The reinstatement works on foreshore structures and the seabed involves dredging activities, the transport and discharge of dredged material using various types of marine vessels.

A safety boat is deployed to warn other craft in the vicinity of the working area.

Craft involved in the works exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and Communicate with Jurong Control for assistance, if required.

For information about operations in Singapore, contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.

Make an
enquiry

enquiry icon

Find your
country

country icon